Pipe work arrived \0/
Finally, pipe work arrived on Friday, so i set to work putting the thing together.
First I drilled 2 holes in the false back to fit the Hydor rotating nozzles through.
First I drilled 2 holes in the false back to fit the Hydor rotating nozzles through.
The SCWD was then piped into the Hydor rotating nozzles
Next the back piping was solvent welded in place
The pipe on the left is the primary overflow, the middle pipe is the return from the OR3500, the pipe on the right is the secondary overflow, which is also used to feed the fuge with a slow gentle trickle
0 Comments:
Post a Comment
<< Home