Monday, April 10, 2006

Almost finished!

Continued plumbing the back of the tank to house the refugium.
Once it was all put together it looked quite neat, and piping etc all fitted inch perfect (thanks to CAD!)


This is viewed from the front with the doors open. Top is the refugium and below is the sump

0 Comments:

Post a Comment

<< Home